The module is too heavy to trust
Infinite capacity, missing setup time, or a sequence nobody on the floor believes. People export the open orders and rebuild the week by hand.
Exact Apps / Production scheduling
Keep your ERP. Replace the spreadsheet.
JobBOSS, Epicor, Global Shop, and the rest already hold the jobs. The week still lives in Excel because the scheduling screen isn’t trusted. Send this week’s open-order export (or the spreadsheet you actually run from). In 24 hours we’ll show rush-order impact on your machines — without replacing your system of record.
Built for shops that already own an ERP and still build the week in Excel or on a whiteboard.
Not ready? Grab the free job shop schedule template.
Inserting 1901 on Wednesday pushes 1766 to Thursday and overloads the weld cell unless 1710 moves to second shift.
A manufacturing schedule board only works if it knows capacity. Due dates alone just sort a list. The spreadsheet becomes the real system because it is the only place someone put machines, setup, and the rush job in the same view.
Infinite capacity, missing setup time, or a sequence nobody on the floor believes. People export the open orders and rebuild the week by hand.
If that supervisor is in a meeting, nobody knows whether the Haas is free Thursday or which job is already late.
A text says "this has to ship Friday." The spreadsheet gets edited. Three other jobs slip, and the customer promise was already made.
We can import from spreadsheets or connect with the systems you already use. A named ERP connection is only promised after we have seen how your orders actually leave that system.
Keep the system that already holds the order, the quote, and the invoice. The production schedule is the workflow those systems often do badly for a 10- to 80-person shop. That is the piece we build.
The spreadsheet, a photo of the whiteboard, or an export of open jobs. If the routing lives in someone's notebook, send that too. The prototype is a schedule built from your work, not a tour of manufacturing software.
No. If the ERP is where orders and costs belong, leave them there. This replaces the production scheduling spreadsheet, the whiteboard, or the schedule that only exists in one person's head.
Usually because it ignores setup, assumes infinite capacity, or takes longer to update than editing the sheet. We build the view people will open on Monday morning.
Yes. That file is the best brief we can get. Import first. A connection to another system comes after we see the export you already trust.
Both the calendar and the constraint. A board that lets you drop jobs onto machines without knowing hours and shifts is another whiteboard. Capacity, conflicts, and late jobs are the point.
If a job cannot start because material is missing, the schedule should say so. If you do not track that yet, we do not invent a warehouse system to get the week under control.
Send the scheduling sheet or a description of how the week gets built. Within 24 hours you get a schedule based on that process. You are not buying a manufacturing suite.
A spreadsheet, a screenshot of the board, or a short note on how a rush order gets squeezed in. We'll show you what replacing that schedule could look like.
We'll send a prototype of this production week within 24 hours.